✓CCC Certification ✓SRRC Type Approval ✓Network Access License ✓Certificates verifiable online 💬 Community Forum
Home / Process & Fees

Process & Fees

One price on a quote is really three separate cost buckets; one timeline in a contract is really seven stages. This page sets out where the money goes, where the time goes, and what can and cannot be saved — all at once. Read it before you negotiate, and you will know which lines to watch.

The Cost Truth

One quotation is really three cost buckets

Many companies are drawn in by “all-in for ¥9,800” and end up paying double — the extra sits in the two buckets nobody spelled out. Break the three apart first, and you will know where to look and where to cut.

BucketWho chargesWhen to payNegotiable?Document you should receive
① Official fees
Application / registration / approval fees
CNCA-designated certification bodies, MIIT After acceptance, before issuance Not negotiable — nationally uniform Official fee receipt
② Testing fees
Type testing, RF testing, network access testing
Designated labs (we coordinate on your behalf, no markup) Prepaid before submission Varies with unit count and test items — optimizable, not simply cut Lab quotation + test report
③ Service fee
Assessment, documents, follow-up, rectification, on-site support
CTLC Paid in three stages (signing / submission / certification) By workload, negotiable; the earlier you settle, the more you save Contract + milestone deliverable list
Our pricing principlethe three buckets itemized in the contract, never bundled into a single "one-price" figure, so every line can always be matched to a receipt.
How testing fees flowyou receive the lab quotation as-is, and payment goes to the lab; we do not profit from testing fees.
When you get exact numbers1–3 business days after reviewing your manual; a written assessment first, then an itemized quote.
Quote formatan Excel breakdown, including unit-division assumptions so you can compare quotes side by side.
The Time Ledger

Seven stages — who does what at each

A timeline is not a number pulled out of thin air. Below is the real rhythm of a standard project; the "common bottlenecks" are the points where two weeks most easily vanish — avoiding them upfront is far cheaper than expediting later.

Free Assessment 1–3 business days

Send us the product manual, spec sheet and circuit block diagram (if available), and we will determine which certificates you need, how many units to file under, and which route to take.

What we docatalog comparison, band and power checks, preliminary unit division, and a recommended certification combination
What you doone manual + product photos, plus a 10-minute form
Common pitfallsA vague manual that does not show band/transmit power forces a second round of confirmation — 2–3 extra days

Signing & lock-in 2–3 business days

Confirm the certification units, test items, milestone dates and itemized fees, then sign the service contract. The more precisely this is settled, the less friction later.

What we doitemized quote, milestone schedule, and a deliverable list attached to the contract
What you doconfirm the model list and trademark usage, then seal and return
Common pitfallsmodel naming inconsistent with the nameplate and packaging means a certificate change later — 1–2 weeks of rework

Document preparation 1–2 weeks

Application form, critical component list, difference statement, antenna gain report, nameplate and label samples, business license and authorization documents.

What we dotemplate-based checklist verification, item-by-item ticking, same-day feedback on gaps, and drafting the difference statement for you
What you doprovide the BOM and critical-part spec sheets, trademark authorization and OEM/ODM agreement (if applicable)
Common pitfallsswitching a critical component supplier without updating the list — judged inconsistent at the factory inspection

Submission & testing 3–8 weeks

Samples go to the designated lab for type testing / RF testing / network access testing. This stage accounts for more than half of the total timeline.

What we dosample briefing, test-interface confirmation, slot booking, weekly progress reports, and rectification plans for non-conforming items
What you doprepare samples in the required quantity (see the table below), provide test interfaces, and support firmware frequency fixing
Common pitfallsno test interface reserved and frequency fixing impossible — the lab returns the samples outright, costing 1–2 weeks to redo

Factory inspection / technical review 1–2 weeks

CCC requires a factory quality-assurance capability inspection; SRRC and network access rely mainly on technical review, focused on consistency.

What we dopre-audit self-check list, on-site attendance, and closed-loop tracking of non-conformity rectification
What you docompile inspection records, a measuring-instrument register, and incoming inspection records for critical parts
Common pitfallsa production line with no QC records or calibration leads to on-site non-conformities and another two weeks of rectification

Issuance & delivery 1–2 weeks

The certification decision is made and the certificate / CMIIT ID / network access approval is issued, together with mark-usage rules and post-certification notes.

What we docertificate verification (model, unit, validity), mark-usage instructions, and electronic archiving
What you doconfirm the certificate matches the nameplate and packaging, then arrange printing
Common pitfallsa certificate model that does not match the packaging print invites challenges in platform or regulatory spot checks

Post-Certification Care Ongoing

CCC certificates are valid 5 years with annual surveillance; network access licenses run 3 years and must be renewed; SRRC requires re-approval when parameters change.

What we doexpiry reminders, change and extension handling, and surveillance inspection attendance
What you doask before changing a critical part or the structure — do not modify first and produce afterwards
Common pitfallsswapping a power adapter without reporting the change suspends the certificate and strands the whole batch in the warehouse
Side-by-side comparison

Three certificates — where the processes differ

All three follow "submit — review — issue", yet the bottlenecks are completely different. Wireless communication devices usually need all three, and getting the order wrong costs an extra month.

ItemCCC Compulsory CertificationSRRC Radio Type ApprovalNetwork Access License
Authority / issuerCertification bodies designated by the SAMR (CNCA)Radio Regulation Bureau, MIITMinistry of Industry and Information Technology (MIIT)
Core stagesType testing + factory inspection + certification decisionRF / EMC testing + technical reviewNetwork access testing + technical review + approval
Factory inspection?Yes (mandatory on first certification)No factory visit in general; consistency is reviewedNo factory visit in general; consistency and protocol compliance are reviewed
Sample quantity2–5 units (by product and project)6 units, 3 of them with reserved test interfaces11 units + 10 cable sets
Times you need to be on siteOnce (factory inspection)0–1 time (if frequency-fixing setup is needed)0 times
Standard timeline2–6 months8–10 weeks5–6 weeks
Validity5 years (annual surveillance)Valid long-term; re-approval needed on parameter changes3 years, renewable on expiry
Most common cause of delayNo QC records at the factory inspection; critical parts inconsistentSamples cannot be frequency-fixed; antenna gain report missingProtocol stack tests fail; TAC/IMEI not applied for

Recommended order when handling them together: SRRC and network access submitted in parallel → CCC type testing started at the same time → factory inspection scheduled last, in one block. Handled in series, the total timeline stretches from 3 months to more than 5.

Quote examples

Three typical products — how the numbers add up

The ranges below are 2026 reference figures for common projects, to help you gauge the budget scale; actual amounts depend on unit division, test items and lab scheduling, and are subject to our written assessment.

TWS Bluetooth earbuds

Mainly SRRC · CCC depends on category
Official feesAbout ¥0
RF / EMC testing fee¥15,000–25,000
Service fee¥10,000–18,000
Indicative total¥25,000–43,000
8–10 weeks. Where to save: a charging case and earbuds of the same series can be filed together; prepare 6 samples in advance with frequency-fixing interfaces to avoid sample returns and resubmission.
6 samples8–10 weeksNo factory inspection

Wi-Fi 6 router

CCC + SRRC + Network Access License (all three)
Official feesAbout ¥1,000–2,000
Total of the three testing fees¥40,000–60,000
Service fee (bundled)¥30,000–45,000
Indicative total¥71,000–107,000
4–5 months in series; parallel handling compresses it to 10–12 weeks. Where to save: one sample batch shared across all three, a shared EMC report, and parallel network access and SRRC submissions.
Three in parallel10–12 weeksFactory inspection required

Digital two-way radios (4 models)

SRRC only · combining models is the key
Official feesAbout ¥0
RF / EMC testing fee¥12,000–20,000
Service fee¥12,000–18,000
Indicative total¥24,000–38,000
8–10 weeks. Where to save: the four models share band and power and differ only in housing and channel count, so filing them as one unit means a single test round; filing separately triples the testing fee.
One unit covering 4 models8–10 weeksNo factory inspection

Estimate your product →

Pitfalls

The five most common "low quote, later markup" patterns

This is not to say a low price is always a problem — it is that these five items must be nailed down in the contract before you sign. Whoever still quotes low after those questions is genuinely low.

Re-test billed separatelyWhen a test fails, the re-test after rectification is charged again per item — never mentioned at signing. The proper practice: state in the contract "includes one rectification re-test" or specify the re-test unit price.
Rectification turns from "guidance" into "doing it for you"Re-tooling, board changes, added filters, crystal replacement — agreed as guidance, then billed by person-day. Confirm before signing how many rectification rounds are included and how overruns are priced.
Factory audit travel and attendanceCharged per person-trip, over a thousand for one cross-province visit. Ask clearly: is attendance included, up to how many times, and is travel reimbursed at cost or charged as a flat fee.
Expediting / queue-jump feeThey promise 8 weeks, then in week 6 say "the lab is fully booked — pay 8,000 to jump the queue". When agreeing a timeline, spell out the extension conditions (e.g. lab scheduling and document-supplement time excluded).
Certificate change / extension feeChanging a model, swapping a critical part or adding a color after certification triggers another quote close to the full price. Ask for the change and extension pricing rules and put them in a contract annex.

Send us these five points and we will comment line by line against your current contract — free of charge, with no obligation to order.

Speed-up

Six levers to compress the timeline — more effective than paying to expedite

Expediting means buying someone else's time with money; these six moves save your own time at almost no cost.

01

Pre-test first

Run a pre-scan before going to the designated lab, resolving radiated, conducted and spurious issues in our own lab. One pre-test takes about 2–3 days and saves a two-week re-test round trip.

02

Subtract when dividing units

Map the model matrix first and group models that differ only in color, capacity or appearance into one unit. Get the units right and you save on the number of test reports and on test rounds.

03

Submit all documents at once

Tick off a checklist item by item: application form, BOM, critical-part spec sheets, antenna report, nameplate sample, authorization letter. Each missing item means another supplement round trip — 3–5 business days on average.

04

Run the three in parallel, not in series

Submit SRRC and network access together, start CCC type testing at the same time, and share samples and EMC data. Done in series, the total timeline stretches from 3 months to 5.

05

Self-check before the factory inspection

Self-check against the audit checklist: inspection records, instrument calibration, incoming inspection of critical parts, non-conforming product handling. Companies with an ISO 9001 base usually pass first time.

06

Leave a rectification window

Do not compress the schedule to the limit. A two-week buffer for rectification is far cheaper than paying 8,000 later to buy a slot, and keeps you from being blocked by lab availability.

Payment & safeguards

How payment works, and what happens if something goes wrong

Spelling out the payment schedule and failure scenarios upfront saves both sides trouble. These four clauses go into our contracts by default.

Three payment stages, each tied to a deliverable

  • 30% on signing: delivery of the certification plan + unit division table + itemized quote
  • 40% on submission: delivery of the completed document checklist verification + lab acceptance receipt
  • 30% on certification: delivery of the certificate / CMIIT ID / network access approval + mark usage instructions
  • Official fees and testing fees are listed separately at actual cost and settled against receipts — not a cent more

Four clauses every contract must include

  • Itemized fees: how much each of the three buckets costs, and how re-tests and changes are priced
  • Timeline and extensions: milestone dates and the conditions for extension, such as document supplements and lab scheduling
  • What if it fails: we bear the cost of document mistakes; if the product falls short, settlement follows completed milestones
  • Deliverable list: which documents each stage delivers and who signs off
What we don't doNo promise of "guaranteed approval" — the certification decision rests with the official body; anyone promising approval is gambling on odds.
What we doProactive milestone reporting — submission, acceptance, test completion and review scheduling, synced by WeChat at every milestone.
Free of chargeassessment and contract review — you get a written opinion even without an order, including a check of another provider's quotation.
Who to call if something goes wrongyour project consultant's direct line — not a transferred call to customer service, but the person who signed the contract.
FAQ

Six frequent questions about money and timelines

If anything else is unclear, just send over the product documents — assessment costs nothing.

Why can two quotes for the same product differ by double?
The gap usually is not in the service fee but in three opaque points. First, certification unit division — the cheap side prices one model as one unit, while multiple models actually have to be split into several units; second, test items — the cheap proposal usually covers only mandatory items and bills rectification re-tests separately; third, follow-on costs (factory inspection attendance, certificate changes) that never make it into the contract. When you receive a quote, insist on the three buckets listed separately with re-test and change pricing stated — only then is it comparable.
Is the testing fee in the quote collected by you or by the lab?
Testing fees are collected by the designated lab; we only coordinate and queue on your behalf. The proper practice is to give you you receive the lab quotation as-isthe lab quotation as-is, with payment going to the lab or a lab invoice provided. We do not take a markup on testing fees, only a service fee — and that is a simple way to judge whether an agency is reliable.
If it can't be obtained, is the money refunded?
No reputable agency promises guaranteed approval; the decision rests with the official body. What can be agreed is this: if failure results from our document errors, omissions or scheduling mistakes, the service fee for that stage is refunded; if failure results from the product itself not meeting the standard and rectification fails, official and testing fees already incurred are non-refundable, and the service fee is settled by completed milestones. We recommend putting this in the contract rather than leaving it verbal.
Can the timeline be expedited? How is the expediting fee calculated?
It can be compressed, not skipped. What compresses is scheduling and the rectification loop: pre-testing upfront, documents submitted in one go, multiple certificates in parallel, lab slots locked in early. Expediting costs come mainly from rush lab slots and on-site engineers, usually charged as a percentage of the testing fee 10%-30% , and must be confirmed before submission — it cannot be added afterwards.
Is it cheaper to handle several models together?
In most cases, yes. Products of the same series with identical critical components and construction can go into one certification unit, so a single type test covers several models and saves multiple testing and official fees. But where differences are too great (power, band, power supply, antenna), splitting into separate units will be required; and improper splitting can be ruled invalid coverage, so unit division must be finalized before submission.
After getting the certificate, are there yearly costs?
CCC certificates are valid 5 years and require periodic surveillance after certification (usually once a year), incurring inspection and travel costs; product changes and critical-part substitutions require a change or extension filing. Network Access Licenses must be renewed at 3 years. SRRC requires re-approval when transmit parameters, antennas or RF circuits change.All of this belongs in the annual budget, rather than being dealt with only after a spot check.
💬Chat with Us 🧮Instant Quote 📞18927411650 💬WeChat ↑Top