✓CCC Certification ✓SRRC Type Approval ✓Network Access License ✓Certificates verifiable online 💬 Community Forum
Testing Resources

Testing Center

Our own standardized lab handles pre-testing, rectification and re-testing; officially designated labs handle formal type tests and network access testing — walking on two legs, catching problems early so submissions don't come back.

HOW WE WORK

In-house lab as the base, formal testing through official channels

Most certifications stall at the same point: metrics only fail after the samples are submitted, then it's rework, reship and queue for re-testing — a whole round lost to logistics. We do pre-testing and rectification in our own lab: over-limit metrics are located on the spot, fixed the same day, re-tested right after. Formal type tests and network access testing still produce reports from officially designated or authorized labs, while we handle matching, scheduling and on-site follow-up.

  • In-house lab covers EMC, RF, electrical safety and communication terminal pre-testing
  • Spurious emissions, harmonics, power overruns and similar issues are fixed on the spot through antenna matching, filtering and shielding, and circuit-structure changes
  • After rectification, multiple re-test rounds need no external lab slots — we control the timeline
  • Formal testing goes to officially designated labs, with our engineers on site handling anomalies as they arise
CTLC in-house lab testing
Capability

Testing capability matrix

Common test items and typical timelines by product and certification type.

Testing fieldCertificationTypical test itemsStandard timeline
Electrical & electronic safetyCCCTemperature rise, dielectric strength, insulation, mechanical strength, construction check3–5 weeks
EMCCCC / SRRCConducted disturbance, radiated disturbance, ESD, surge, radiated immunity2–4 weeks
Wireless RFSRRCTransmit power, frequency range, occupied bandwidth, spurious emissions3–6 weeks
Telecom terminal interfacesNetwork Access LicenseNetwork protocol conformance, interface performance, interoperability testing5–6 weeks
Environmental reliabilityGeneral / customer-specifiedHigh/low temperature, damp heat, vibration, drop, salt spray2–4 weeks
Battery & materialsCCC supporting testsBattery safety (GB 31241), UN 38.3 transport assessment, material composition3–6 weeks
Process

Submission workflow

From sample to report, every one of the five stages has a named owner.

Document pre-review

Completeness check of manuals, schematics and critical component lists

Lab matching

Select the lab by accreditation scope, schedule and location, then lock the slot

Sample shipment

Sample count and condition confirmed; the whole shipment is tracked

Test follow-up

Weekly progress updates; anomalies flagged immediately

Report delivery

Reports checked and archived, then handed over to certification filing

Network

Testing resource coordination

In-house lab for pre-screening and rectification, designated labs for formal testing — arranged nearby to cut shipping and communication overhead.

Shenzhen · In-house lab

EMC · RF · Electrical safety · Communication terminal pre-testing

Shenzhen / Guangzhou

CCC type testing · Appliance safety · Environmental reliability

Shenzhen / Dongguan

RF & EMC · Wireless terminals · Components

Beijing / Shanghai / Chengdu / Xi'an

Radio type approval · Network access testing · On-site test follow-up

💬Chat with Us 🧮Instant Quote 📞18927411650 💬WeChat ↑Top