✓CCC Certification ✓SRRC Type Approval ✓Network Access License ✓Certificates verifiable online 💬 Community Forum
Home / Product Lines

8 Product Lines, Each with Its Own Compliance Plan

We don't make broad “we can do anything” promises. We focus on the three national mandatory certifications — CCC, SRRC type approval and network access licensing — and spell out the catalog placement, certification combination and sticking points for each product line. Match your product against it and you'll know which certificates you need.

Product lines covered8Smart hardware · Communication equipment · Smart home · Industry terminals · IoT · Sensing · Satellite · Special
Clients served29Grouped by product line; specific projects are subject to agreement
Certifications involvedCCC / SRRC / CTA — our three core servicesBeiDou-only special testing · Battery safety support · Frequency use licence coordination
Assessment turnaround1–3 business daysWritten determination + itemised quote; assessment before contract
△ Product Line Overview

Find the certification combination by product line

Each card maps to one product line: which certificates are needed, the reference timeline, and where this line most often gets stuck. Click through for the full plan.

SRRC + CCC per catalog; add CTA for cellular versions01

Smart Hardware

Smart Hardware

Smart watches / smart bands / smart rings / TWS earbuds

8–12 weeks · View plan →
SRRC + CTA network access + CCC per catalog02

Communication Equipment

Communication Equipment

Phones & tablets / CPE & MiFi / cellular modules / wireless fixed phones

12–20 weeks · View plan →
SRRC required; CCC by category03

Smart Home

Smart Home

Smart speakers & control panels / smart locks / smart lighting / smart switches & sockets

6–14 weeks · View plan →
SRRC/CCC per catalog; determine medical status first04

Industry Smart Terminals

Industry Smart Terminals

AI toys & talking dolls / consoles & handhelds / AR/VR/MR headsets / portable projectors

8–14 weeks · View plan →
SRRC + CTA; NB-IoT determined model by model05

IoT

IoT & Industrial Networking

DTU / RTU / industrial routers & gateways / industrial switches / edge computing gateways

10–16 weeks · View plan →
CCC/SRRC by form factor; add CTA for remote transmission devices06

Sensing & Monitoring

Sensing & Monitoring

Temperature & humidity / pressure / gas sensors / smart meters & test instruments / smart switches & circuit breakers / NB-IoT IoT terminals

6–12 weeks · View plan →
SRRC + earth station network entry + BeiDou-only special testing07

Satellite Industry Equipment

Satellite Equipment

Tiantong satellite phones / BeiDou short-message terminals / shipborne / airborne / vehicle-mounted satellite stations / satellite earth station equipment

10–18 weeks · View plan →
Mainly SRRC + frequency licence coordination; CTA depends on the access method08

Special Communication Equipment

Special Communication

Millimetre wave / LiDAR / security & weather radar / portable satellite stations & ad-hoc network radios / emergency command cases & soldier terminals

Assessed per project · View plan →
△ Side-by-side comparison

Certification Requirements Across 8 Product Lines

One table shows which lines need all three certificates, which need approval only, and where the timelines differ.

Product lineCCCSRRC Type ApprovalNetwork Access LicenseTypical TimelineMain sticking points
01 Smart HardwareWhole-device approval + per catalogSRRC across the boardCTA for cellular versions8–12 weeksMissed accessories and SAR assessment; power banks are now in the CCC catalog
02 Communication EquipmentPer catalog (three certificates common)SRRC across the boardRequired (public network access)12–20 weeksFinalising band combinations and software version consistency; module-device coordination
03 Smart HomeBy category (including switches and sockets)SRRC across the boardGateway-type6–14 weeksMulti-protocol coexistence interference; SKU unit division drives cost
04 Industry Smart TerminalsPer catalog + toy safetySRRC across the boardSmart-city connected types8–14 weeksOrder for determining medical status; connected standards such as GB 35114
05 IoTPer catalogSRRC across the boardRequired (public network access)10–16 weeksNB-IoT network access easily missed; meter sample version consistency
06 Sensing & MonitoringBy form factor (low-voltage apparatus is listed)SRRC when wireless is includedCellular types6–12 weeksRemote transmission devices easily miss CTA; key component consistency
07 Satellite EquipmentBy whole-device form factorSRRC across the boardDepends on access + earth station10–18 weeksEIRP and antenna gain; station licensing and the BeiDou-only path
08 Special Communication EquipmentDetermined per catalogSRRC across the boardDepends on the access methodAssessed per projectDedicated band coordination; wireless configuration consistency across vehicle models

“Depends on form factor / category / access method” means the determination must be made for the specific product, not generalised; the written assessment is final.

△ How to use

Three Steps to Settle Your Certification Path

Match your caseStep 1

First find the closest product line, review its certification matrix and sticking points, and rule out certificates that clearly don't apply.

Submit documentsStep 2

Spec sheets, antenna data, wireless module models and target sales channels — the more specific, the more accurate the determination.

Get the written determination1–3 business days

You receive “which certificates + whether units can be merged + timeline + itemised fees”, and sign only after confirming.

△ Shared capabilities

Cross-Product-Line Service Capabilities

The compliance systems behind the eight product lines are interconnected. By isolating shared capabilities, parallel projects reuse the same resources and processes, shortening the overall timeline.

CapabilityWhat it coversValue to clients
Compliance path designCompare the product function list against the mandatory catalog item by item, and output a certificate combination matrix, submission checklist and division of responsibilitiesAvoid missing or wrong certificates and wasted submission spending
Pre-test & RectificationBaseline screening of four indicator sets — RF, EMC, safety and reliability; engineers stationed on site to follow testing, tracing problems down to component and structural levelSurface problems before formal submission and reduce repeated submissions
Filing & documentsTechnical documents, difference statements, nameplates and warning labels, manual compliance, and preparing and answering filing formsDocuments right the first time, fewer correction cycles
Factory inspection & systemsCoaching on CCC factory quality assurance capability and audit preparation, with consistency control over key components and key processesLower the risk of failing the on-site audit and safeguard mass-production consistency
Timeline & parallel managementParallel scheduling for multiple certificates, critical-path identification, and early lock-in of sample quantities and rectification windowsControllable overall timeline that fits your launch cadence
Certificate maintenanceChange filing, annual surveillance and spot-check response, standard revision tracking, and certificate expiry alertsKeep certificates valid long term and reduce compliance interruptions
△ Quick reference

Quick Reference of Key Compliance Items

Actual applicability is determined by product function, catalog placement and use scenario; one product may fall under several items at once.

Compliance itemFull name and governing basisMain applicable productsNature
CCCCompulsory product certification, per the compulsory product certification catalog and administration regulationsListed IT equipment, audio & video, telecom terminals, household appliances, low-voltage apparatus, power banks, etc.Mandatory
SRRCRadio transmitting equipment type approval, per the Radio Regulations, administered by the Ministry of Industry and Information TechnologyAll equipment with radio transmitting capabilityMandatory
CTATelecom equipment network access license, per the Telecommunications Regulations, administered by the Ministry of Industry and Information TechnologyCommunication equipment and terminals connected to the public telecom networkMandatory
BeiDou-onlyBeiDou special testing and BeiDou-only mode verification (supporting SRRC for satellite terminals)BeiDou positioning, navigation and timing terminalsSpecial
Battery safetyGB 31241 battery safety testing, supporting CCC submission and UN38.3 transport assessmentPortable products containing lithium-ion batteriesSupporting test
△ FAQ

Product Lines and Certification Combinations

My product doesn't fit neatly into these 8 lines — what then?
Use the closest product line as a reference, then determine separately based on actual bands, power and access method. For new categories we issue a written placement opinion rather than forcing a template.
How do you handle one product spanning two lines — say a smart lock with 4G?
Split by function: the lock body follows smart home CCC + SRRC, while the cellular part is assessed as a telecom terminal for a Network Access License. Multiple placements for one product is normal — the key is not to miss a certificate.
Are the timelines in the product line plans a commitment?
They are reference ranges, not commitments. Actual timelines depend on lab availability, sample condition and the number of rectification rounds; our assessment sheet gives the schedule and key milestones for your specific project.
Can I do just one of the certificates?
Yes. You can also take only pre-testing and rectification guidance and submit for formal testing yourself. Services and quotes are itemised, with no bundling.
💬Chat with Us 🧮Instant Quote 📞18927411650 💬WeChat ↑Top